Bharti Enviro logo
Bharti EnviroServices Pvt. Ltd.
De-Salination Plant — view 1
De-Salination Plant — view 2
De-Salination Plant — view 3
De-Salination Plant — view 4
Water Treatment Plant

De-Salination Plant

SWRO and MSF desalination systems converting seawater into potable supply.

500 m³/day – 50 MLD

Capacity range

Up to 45,000 mg/L TDS

Feed salinity

< 500 mg/L (WHO potable standard)

Product TDS

40–50%

Recovery

Overview

What is a De-Salination Plant?

Our desalination plants are engineered around seawater reverse osmosis (SWRO) and multi-stage flash (MSF) technology, tailored for coastal industrial sites, islands, and municipalities with scarce freshwater. Bharti Enviro integrates intake pre-treatment, high-pressure RO trains with energy-recovery, and post-treatment remineralisation to deliver WHO-compliant product water.

Key Features

  • SWRO single-pass or double-pass configuration with isobaric energy-recovery devices
  • Cartridge filtration + UF pre-treatment reduces SDI below 3, protecting RO elements
  • CO₂ dosing + calcite contactor for WHO-compliant Ca/Mg remineralisation
  • Remote monitoring with satellite/cellular SCADA for unmanned offshore operation

Technical Specifications

Engineering Parameters

Capacity range
500 m³/day – 50 MLD
Feed salinity
Up to 45,000 mg/L TDS
Product TDS
< 500 mg/L (WHO potable standard)
Recovery
40–50%
Specific energy
3.0–4.0 kWh/m³ (with ERD)
Design standard
WHO / IS 10500 / BIS

Specifications are indicative. Final parameters confirmed during engineering review.

Gallery

Installation Gallery

Auto-rotating — hover to pause, click thumbnails to jump, expand for full view.

De-Salination Plant — view 1
De-Salination Plant — view 2
De-Salination Plant — view 3
De-Salination Plant — view 4
1 / 4

Applications

Industries Served

Our De-Salination Plant is deployed across a wide range of industrial and municipal applications.

Coastal municipalitiesOffshore oil and gas platformsIsland resorts and communitiesIndustrial process water in coastal zonesNaval and defence installationsEmergency drinking-water supply

Start a project

A 30-minute screening call usually saves a year of avoidable rework.

Walk us through your project. We'll map regulator pathways, indicative timelines, and a costed engagement plan, at no charge.