BBharti EnviroServices Pvt. Ltd.
ISO 9001:2015 · ISO 14001:2015 · Since 2009

Environmental engineering for industrial India.

EIA & Environmental Clearance, field monitoring, audits, and turnkey ETP, ZLD, and APCD systems — delivered for 150+ industrial clients across pharma, chemicals, mining, and infrastructure.

MoEFCCCPCBGPCBNABL alignedIFC PS aligned

Trusted by leading manufacturers and operators

150+ industrial clients across pharma, chemicals, mining, and infrastructure.

Bhagat Pharma logo
Shreyaa MEDILIFE logo
Exotic Life Sciences logo
Kalintis Healthcare logo
Pardesi Global Services logo
Rasayano logo
Aether Industries logo
Meghmani Organics logo
Atul Ltd. logo
Torrent Pharma logo
Nirma Ltd. logo
Adani Enterprises logo
Bhagat Pharma logo
Shreyaa MEDILIFE logo
Exotic Life Sciences logo
Kalintis Healthcare logo
Pardesi Global Services logo
Rasayano logo
Aether Industries logo
Meghmani Organics logo
Atul Ltd. logo
Torrent Pharma logo
Nirma Ltd. logo
Adani Enterprises logo

By the numbers

A track record measured in mandates, not marketing.

0+

Projects Delivered

0+

Years of Experience

0+

Industry Sectors

0%

Repeat Clients

Featured capability

Wastewater treatment, engineered for a decade of audits.

We design, build, and operate ETP, STP, and Zero Liquid Discharge systems for industrial and municipal clients. Process selection is informed by influent characterization, recovery targets, footprint, and 10-year lifecycle cost — not lowest capex.

  • Process selection from MBBR / SBR / MBR / EOP technologies
  • MEE, ATFD, and crystallizer-based ZLD architectures
  • RO, UF, ion-exchange recycle and reuse loops
  • OCEMS integration and SPCB protocol uplink
Learn about our WWT practice
ZLD · Live monitoring

Recovery

99%

Capacity

1,200 KLD

Uptime

99.4%

Industries served

Where our work shows up.

Sector-specific playbooks built from years of fieldwork — refined across pharma, chemicals, mining, infrastructure, and beyond.

Mining, River Valley & Primary Processing

Mining, River Valley & Primary Processing

Power Plant & Cement Industries

Power Plant & Cement Industries

Manufacturing Industries

Manufacturing Industries

Oil & Gas Exploration — Off-shore, On-shore, Service

Oil & Gas Exploration — Off-shore, On-shore, Service

Infrastructure & Environmental Services

Infrastructure & Environmental Services

Building, Large Construction & Township Development

Building, Large Construction & Township Development

Automobile, Food & Other Sectors

Automobile, Food & Other Sectors

Why Bharti Enviro

Built for industry, accountable to outcomes.

Six commitments that shape how we scope, staff, and deliver every mandate.

Defensible compliance

Documentation rigorous enough for MoEFCC, GPCB, IFC, and lender review. We build the trail before you need it.

Predictable timelines

Approvals sequenced in parallel where regulators permit. Time-to-commissioning shortens without shortcuts.

Engineering depth

EIA modelers, process engineers, IH specialists, and surveyors under one roof — not a brokered network.

Lifecycle cost first

Designs benchmarked on 10-year cost, not lowest capex. ZLD systems that recover ~99% over a decade, not a quarter.

Outcome-based O&M

We operate what we build. Long-term O&M with KPI-linked SLAs and guaranteed regulatory uptime.

Senior leadership on every mandate

A partner-grade lead is named at kickoff and stays accountable through close-out. No bait-and-switch staffing.

How we work

A four-stage delivery model.

From the first screening call to the last compliance report — sequenced for clarity and accountability.

  1. 01

    Scope & screen

    Free 30-minute screening call to map applicability, regulator pathways, and an indicative timeline.

  2. 02

    Plan & baseline

    Engagement plan, ToR, and baseline data — air, water, soil, social — captured under accredited protocols.

  3. 03

    Engineer & approve

    EIA, modeling, and engineering deliverables. Regulator submissions, public hearings, and approvals secured.

  4. 04

    Build & operate

    Turnkey ETP, ZLD, APCD execution, with optional multi-year O&M and continuous compliance reporting.

Selected work

Recent mandates, plainly stated.

View all projects
EIA & Environmental Clearance — API Manufacturing Expansion
Pharmaceuticals2024

EIA & Environmental Clearance — API Manufacturing Expansion

Bharuch, Gujarat 2024

Outcome · EC obtained in 11 months without amendment

1,200 KLD ZLD System — Specialty Chemicals
Chemicals2024

1,200 KLD ZLD System — Specialty Chemicals

Dahej, Gujarat 2024

Outcome · Zero discharge demonstrated; recovered water reused 98%

ESDD for Acquisition — Multi-site Industrial Portfolio
Cross-sector2023

ESDD for Acquisition — Multi-site Industrial Portfolio

Gujarat & Maharashtra 2023

Outcome · Liability identified, deal repriced by INR 38 Cr

What clients say

The work speaks. So do the people we work for.

Bharti Enviro carried our greenfield plant from screening through final EC without a single regulatory deferral. Their EIA depth and public-hearing preparation was a different league.
RP

Rajiv Patel

Director — Operations · Exotic Life Sciences

The ZLD system they engineered for our pharma site has run within compliance for thirty consecutive months. The team behaves like part of our own operations.
AK

Anand Kothari

Plant Head · Bhagat Pharma

Honest, technical, and accountable. Their EHS audit caught issues a previous big-name consultant had missed — and they helped us close every one of them.
MS

Meera Shah

EHS Manager · Kalintis Healthcare

We engaged them for a complex CRZ project and they navigated the committee process with patience and precision. We will use them again.
SR

Sandeep Rao

Project Director · Pardesi Global Services

FAQ

Frequently asked questions

Common regulatory and engineering questions we answer at the screening stage.

Projects listed in the Schedule of EIA Notification 2006 — across mining, thermal power, infrastructure, manufacturing, building construction (≥20,000 m²), and chemical/pharma sectors — require prior Environmental Clearance from MoEFCC (Category A) or SEIAA (Category B). We assess applicability during a 30-minute screening call.

Start a project

A 30-minute screening call usually saves a year of avoidable rework.

Walk us through your project. We'll map regulator pathways, indicative timelines, and a costed engagement plan — at no charge.