
EIA & Environmental Clearance — API Manufacturing Expansion
Outcome · EC obtained in 11 months without amendment
EIA & Environmental Clearance, field monitoring, audits, and turnkey ETP, ZLD, and APCD systems — delivered for 150+ industrial clients across pharma, chemicals, mining, and infrastructure.
Trusted by leading manufacturers and operators
150+ industrial clients across pharma, chemicals, mining, and infrastructure.
By the numbers
0+
Projects Delivered
0+
Years of Experience
0+
Industry Sectors
0%
Repeat Clients
Services
Six tightly integrated practice areas — built so a single mandate can move from EIA approval all the way to commissioned, operating compliance.
Featured capability
We design, build, and operate ETP, STP, and Zero Liquid Discharge systems for industrial and municipal clients. Process selection is informed by influent characterization, recovery targets, footprint, and 10-year lifecycle cost — not lowest capex.
Recovery
99%
Capacity
1,200 KLD
Uptime
99.4%
Industries served
Sector-specific playbooks built from years of fieldwork — refined across pharma, chemicals, mining, infrastructure, and beyond.

Mining, River Valley & Primary Processing

Power Plant & Cement Industries

Manufacturing Industries

Oil & Gas Exploration — Off-shore, On-shore, Service

Infrastructure & Environmental Services

Building, Large Construction & Township Development

Automobile, Food & Other Sectors
Why Bharti Enviro
Six commitments that shape how we scope, staff, and deliver every mandate.
Documentation rigorous enough for MoEFCC, GPCB, IFC, and lender review. We build the trail before you need it.
Approvals sequenced in parallel where regulators permit. Time-to-commissioning shortens without shortcuts.
EIA modelers, process engineers, IH specialists, and surveyors under one roof — not a brokered network.
Designs benchmarked on 10-year cost, not lowest capex. ZLD systems that recover ~99% over a decade, not a quarter.
We operate what we build. Long-term O&M with KPI-linked SLAs and guaranteed regulatory uptime.
A partner-grade lead is named at kickoff and stays accountable through close-out. No bait-and-switch staffing.
How we work
From the first screening call to the last compliance report — sequenced for clarity and accountability.
Free 30-minute screening call to map applicability, regulator pathways, and an indicative timeline.
Engagement plan, ToR, and baseline data — air, water, soil, social — captured under accredited protocols.
EIA, modeling, and engineering deliverables. Regulator submissions, public hearings, and approvals secured.
Turnkey ETP, ZLD, APCD execution, with optional multi-year O&M and continuous compliance reporting.
Selected work

Outcome · EC obtained in 11 months without amendment

Outcome · Zero discharge demonstrated; recovered water reused 98%

Outcome · Liability identified, deal repriced by INR 38 Cr
What clients say
“Bharti Enviro carried our greenfield plant from screening through final EC without a single regulatory deferral. Their EIA depth and public-hearing preparation was a different league.”
Rajiv Patel
Director — Operations · Exotic Life Sciences
“The ZLD system they engineered for our pharma site has run within compliance for thirty consecutive months. The team behaves like part of our own operations.”
Anand Kothari
Plant Head · Bhagat Pharma
“Honest, technical, and accountable. Their EHS audit caught issues a previous big-name consultant had missed — and they helped us close every one of them.”
Meera Shah
EHS Manager · Kalintis Healthcare
“We engaged them for a complex CRZ project and they navigated the committee process with patience and precision. We will use them again.”
Sandeep Rao
Project Director · Pardesi Global Services
FAQ
Common regulatory and engineering questions we answer at the screening stage.
Projects listed in the Schedule of EIA Notification 2006 — across mining, thermal power, infrastructure, manufacturing, building construction (≥20,000 m²), and chemical/pharma sectors — require prior Environmental Clearance from MoEFCC (Category A) or SEIAA (Category B). We assess applicability during a 30-minute screening call.
Start a project
Walk us through your project. We'll map regulator pathways, indicative timelines, and a costed engagement plan — at no charge.